MEC&F Expert Engineers

Thursday, December 4, 2014

GAS COMPRESSOR FACILITIES FOR THE CONSTITUTION PIPELINE - THE WRIGHT COMPRESSOR STATION EXPANSION

 

 

GAS COMPRESSOR FACILITIES FOR THE CONSTITUTION PIPELINE

As part of the original proposal, Constitution Pipeline Company proposed to construct a 32,000 horsepower gas turbine compressor station located in Schoharie, NY. However, in an attempt to further reduce environmental and landowner impacts, Constitution Pipeline Company has reached an agreement with Iroquois Gas Transmission to expand its existing Wright compressor station to accomplish the same objectives as the original proposal. 
To learn more about Iroquois’ Wright Interconnect Project, click here.



Compressor Stations
Compressor stations, sometimes called pumping stations, are the “engine” that powers an interstate natural gas pipeline. As the name implies, the compressor station compresses the natural gas, (increasing its pressure) to push the gas through the pipeline.
Most compressor stations are automated so that the compressors can be started, controlled and stopped from a central control location regardless of the weather conditions, time of day, or day of the week. The automation system also acts to protect the equipment, facility, and surrounding area in the event that the equipment is not operating as it was intended. The operators of the system continuously monitor and adjust the mix of compressors that are running to maximize efficiency as well as keeping detailed operating data on each compressor station. The control center also can remotely operate shut-off valves along the pipeline system.

HIGH POTENTIAL NEAR MISS – UPDATE - ORDER RESPECTING DANGEROUS OPERATION ON HMDC GBS SLAB





High Potential Near Miss – Update  - Order Respecting Dangerous Operation on HMDC GBS Slab

October 14, 2014

On Friday, October 10, 2014 the C-NLOPB’s Chief Safety Officer (CSO) issued an Order Respecting Dangerous Operation for work involving personnel working on top of the Hibernia Gravity Base Structure (GBS) slab, following a High Potential Near Miss that occurred on September 14, 2014.



The gravity base structure at the deepwater site consists of a 105.5m concrete caisson, constructed using high-strength concrete, reinforced with steel rods and pre-stressed tendons.

As a result of the investigation report submitted by HMDC, it is the opinion of the CSO that continuation of this work has the potential to result in serious bodily injury.
No further work activity is to occur involving personnel working on top of the Hibernia GBS slab until measures/barriers for the safe conduct of such work are in place to the satisfaction of the CSO.



Positioning the topsides on the gravity base structure.


Media Contacts:
Margot Bruce-O'Connell
HMDC Public Affairs
(709) 778-7222
margot.p.bruce-o'connell@exxonmobil.com
Sean Kelly MA, APR, FCPRS
C-NLOPB Manager of Public Relations
(709) 778-1418
skelly@cnlopb.ca




HIGH POTENTIAL NEAR MISS – SAFETY RETENTION CLAMP DROPPED 40 FEET ON THE GSF GRAND BANKS DRILLING RIG






High Potential Near Miss – Safety Retention Clamp Dropped 40 feet on the GSF Grand Banks drilling rig












October 17, 2014



Husky Energy has reported a high potential near miss that occurred on the GSF Grand Banks drilling rig on October 16, 2014.  A 3 lb hang off line safety retention clamp dropped approximately 40 ft to the drill floor. There were no injuries. A Time Out for Safety was taken, rig operations were suspended and a safety stand down was communicated by the Offshore Installation Manager to the drill team once the rig floor was secure. Husky is investigating the incident.











The GSF Grand Banks has been drilling at the North Amethyst oilfield.



Media Contacts:



Husky Energy Contact
Colleen McConnell
(709) 724-3504
colleen.mcconnell@huskyenergy.com









C-NLOPB following up on Synthetic Based Drilling Fluid Spill



C-NLOPB following up on Synthetic Based Drilling Fluid Spill
 
November 19, 2014
The C-NLOPB is following up on a report by Statoil of an estimated 6,000 litre spill of synthetic based drilling fluid which occurred on November 17, 2014. The spill resulted from a 7cm slit in the hose during transfer from the support vessel Maersk Clipper to the West Hercules drilling rig. Transfer was shut down immediately and the valves onboard were closed. The hose was immediately disconnected and returned to the rig.

The reported volume is calculated on a ‘worst case scenario’ based on the rated capacity of the pump over the duration that the pump was running with 100% losses to sea. The actual volume will be determined in the investigation by Statoil. Canadian Coast Guard was notified. The spill has been recorded on the C-NLOPB’s website under Environment - Spill Statistics, which was updated on November 19, 2014.

Statoil Canada Contact:
Alex Collins
Acting Lead, Communications
Statoil Canada Ltd.
(709) 769-8967 (cell)
acoll@statoil.com

C-NLOPB Contact:
Sean Kelly M.A., APR, FCPRS
Manager of Public Relations
(709) 778-1418
(709) 689-0713 (cell)
skelly@cnlopb.ca


The C-NLOPB was created in 1986 through the Atlantic Accord for the purposes of regulating the oil and gas industry offshore Newfoundland and Labrador. The Board operates at arms-length from governments and reports to both the Federal and Provincial Ministers of Natural Resources. Decisions of the Board, referred to in legislation as ‘Fundamental Decisions’, are referred to government for approval or rejection.

Pursuant to the legislation, the C-NLOPB has four regulatory mandates: Safety, Environmental Protection, Resource Management and Industrial Benefits. The Board regulates exploration licences, significant discovery licences, and production licenses covering an area of 7,365,000 hectares; that is an area of about two-thirds of the size of the island portion of the Province of Newfoundland and Labrador.

The Board is comprised of seven persons; three appointed by the Federal Government, three appointed by the Provincial Government, and a Chair and CEO that is appointed jointly by the two governments. Board members are: Scott Tessier (Chair and CEO), Ed Williams (Vice-Chair), Ed Drover, Conrad Sullivan, Lidija Cicnjak-Chubbs and Cynthia Hickman.

HIGH POTENTIAL NEAR MISS ON THE WEST AQUARIUS DRILLING RIG. EXXONMOBIL AND CHEVRON CANADA ARE THE PRINCIPAL CURRENT OIL RIG OPERATORS.






High Potential Near Miss on THE West Aquarius drilling rig.  ExxonMobil AND CHEVRON CANADA ARE the PRINCIPAL current oil rig operatorS.
December 3, 2014
Hibernia Management and Development Company (HMDC) reported a high potential near miss on West Aquarius drilling rig that occurred on December 3, 2014.  A bracket for the derrick elevator service loop dropped 22.5 meters (67 feet).   The service loop bracket is installed in the derrick/mast.  The service loops are power cables and/or hydraulic hoses for providing either power or fluids service. The bracket holds the wires/hoses together, that is also called wire holder.  The bracket weighs approximately 5 kg (11 pounds).  



Personnel were working on the drill floor, but not in the area of the dropped object.  Nobody was injured.
There are ways of minimizing the fall of a bracket. In an oil derrick separate service loops which are power cables and/or hydraulic hoses are affixed at one end to a top drive and affixed at an opposite end to an oil derrick end, adding a series of polyurethane supports or rungs along the length of the separate service loops to provide a little lateral motion but to limit the overall amount of lateral motion.  The rungs will also help insure that the cables and hoses do not wrap themselves around everything when the wind blows.  In order to carry the weight of the cables, two parallel steel cables are affixed on either side of the copper cables, and two steel cables are affixed on either side of the hydraulic hoses. These steel cables will be terminated at the derrick and the top drive by being affixed to steel brackets received in steel mounting plates all designed to withstand the loads.



Hibernia Shareholder companies
The shareholders of Hibernia Management and Development Company Ltd. (HMDC) are: ExxonMobil Canada (33.125%), Chevron Canada Resources (26.875%), Suncor (20%), Canada Hibernia Holding Corporation (8.5%), Murphy Oil (6.5%) and Statoil Canada Ltd. (5%).

Media Contacts:
Margot Bruce-O'Connell
HMDC Public Affairs
(709) 778-7222
margot.p.bruce-o'connell@exxonmobil.com
Sean Kelly M.A., APR, FCPRS
Manager of Public Relations
(709) 778-1418
skelly@cnlopb.ca


Metropolitan Engineering, Consulting & Forensics (MECF)
Providing Competent, Expert and Objective Investigative Engineering and Consulting Services
P.O. Box 520
Tenafly, NJ 07670-0520
Tel.: (973) 897-8162
Fax: (973) 810-0440
We are happy to announce the launch of our twitter account. Please make sure to follow us at @MetropForensics or @metroforensics

Metropolitan appreciates your business.
Feel free to recommend our services to your friends and colleagues.