MEC&F Expert Engineers

Thursday, November 13, 2014

TIME TO GET HEATING EQUIPMENT CLEANED AND INSPECTED - FOR YOUR FAMILY'S SAFETY AND YOUR PROPERTY PROTECTION



Time to get heating equipment cleaned and inspected



As temperatures drop and home heating systems kick into gear, remember to get your home heating systems inspected and cleaned as soon as possible.  That’s a key message from the nonprofit National Fire Protection Association (NFPA) and the U.S. Fire Administration (USFA), who are teaming up to reduce the risk of home heating fires this December, January and February, when half of all U.S. home heating fires occur.
According to NFPA, home heating equipment is the second leading cause of U.S. homes fires; failure to clean heating equipment is the most common reason for these fires.
Through their joint winter fire safety campaign, “Put a Freeze on Winter Fires,” NFPA and USFA urge everyone to get their home heating systems inspected and cleaned annually by a trained professional, preferably before the start of the season. This will ensure that your home heating system is working properly, and can significantly reduce your risk to associated fires.  If you have a chimney, make sure it’s also inspected and cleaned, if necessary, by a trained professional.  Creosote - a sticky, oily, combustible substance created when wood does not burn completely - rises into the chimney as a liquid and deposits on the chimney walls, causing one-quarter of all home heating  fires.
Winter fires are preventable! For more heating safety advice from NFPA and USFA’s “Put a Freeze on Winter” campaign, visit www.nfpa.org/winter.


Metropolitan Engineering, Consulting & Forensics (MECF)

Providing Competent, Expert and Objective Investigative Engineering and Consulting Services
P.O. Box 520
Tenafly, NJ 07670-0520
Tel.: (973) 897-8162
Fax: (973) 810-0440
We are happy to announce the launch of our twitter account. Please make sure to follow us at @MetropForensics or @metroforensics
To unsubscribe from future technical blogs and announcements, please reply to this email with the word “unsubscribe” in the subject line.

Metropolitan appreciates your business.
Feel free to recommend our services to your friends and colleagues.



FLUOR ENTERPRISES FAILED TO MONITOR AND MAINTAIN LIQUID PROPANE IN FEMA TRAILERS. ITS INSURER AND NOT THE SUBCONTRACTOR MUST PAY FOR THE PROPERTY DAMAGE AND DEATHS DURING KATRINA



FLUOR ENTERPRISES FAILED TO MONITOR AND MAINTAIN LIQUID PROPANE IN FEMA TRAILERS.  ITS INSURER AND NOT THE SUBCONTRACTOR MUST PAY FOR THE PROPERTY DAMAGE AND DEATHS DURING KATRINA



 This case involves an insurance-coverage dispute. Fluor Enterprises, Inc. (“Fluor”) contracted with the Federal Emergency Management Agency (“FEMA”) to manage the delivery and installation of FEMA trailers following Hurricanes Katrina and Rita. Fluor subcontracted with MMR Constructors, Inc. (“MMR”) to haul and install the trailers. As part of the agreement between Fluor and MMR, MMR agreed to indemnify Fluor for any injuries arising, directly or indirectly, out of the parties’ contract itself or out of MMR’s acts or omissions. As relevant here, Fluor insured its liabilities through Westchester Fire Insurance Co. (“Westchester”) and MMR insured its liabilities through Liberty Mutual Insurance Co. (“Liberty”). 

A flash fire occurred in one of the trailers that MMR had hauled and installed, injuring the trailer’s inhabitant and killing her friend.  The fire was caused in part by the failure of the trailer’s liquid-propane (“LP”) detector to alarm. The injured parties sued Fluor, MMR, and their insurers. Those suits settled. Now, in this case, Liberty seeks reimbursement for its settlement payments from Westchester, arguing that MMR was not responsible for any of the injuries. The issue before us is whether MMR was required, as part of its contract with Fluor, to test the LP detector and whether its failure to do so was a but-for cause of the injuries. 

Following a bench trial, the district court concluded that MMR was under no such obligation. Consequently, the district court determined that MMR was under no obligation to indemnify Fluor, defeating coverage, and that Fluor was not covered under an additional-insured provision contained in MMR’s insurance policies with Liberty. We conclude that MMR was not obligated to test any trailer’s LP detector and the record supports the conclusion that Fluor did not in fact direct MMR to do so with respect to the particular trailer in which the fire occurred. Accordingly, the Fifth Circuit Court of Appeals AFFIRMED the judgment of the district court.



THE AMPHIPOLIS TOMB SURROUNDING WALL - A MARVEL OF GREEK ENGINEERING BUILT 2,300 YEARS AGO

 

THE AMPHIPOLIS TOMB SURROUNDING WALL - A MARVEL OF GREEK ENGINEERING BUILT 2,300 YEARS AGO

 

The surrounding Wall

The surrounding wall of the Tomb is 500 meters long and it is almost a perfect circle. The diameter of the Tomb is 158.4 meters and this is the standard of Deinokratis. It was him that constructed the walls of Alexandria, which are 15.840 meters long. This beautiful surrounding wall, which is almost intact, reaches 3 meters high and is covered by cornice. The marbles come from the island of Thassos.


Missing pieces of the Tumulus surrounding wall have been located

More than 500 missing pieces from the surrounding wall have been found near the place where the Lion of Amphipolis sits. More than 100 stones were discovered just a couple of days ago in Lake Kerkini, where the pieces were transferred in 1936 by the company Ulen, who were in-charge of the construction for the Dam at Kerkini.






Details of the Wall

The marble of the Wall was brought from the island of Thassos and is in almost perfect condition.



Inside the corridor

The photo depicts the base of the wall, the blocks of marble and the base of the wall, just behind the wall. It's impressive to look at the top, to realize the actual depth of the excavations.



The cornice of the Wall

The surrounding wall is covered by an amazing cornice which looks almost intact, even if it was constructed 2.300 years ago.



Multiple levels of marble blocks

As we can see in the photo, the perimeter consists of multiple levels of stone. Total height of the perimeter wall is 3 meters.



Excavations of the perimeter

The tomb of Amphipolis is surrounded by a 500-meter marble wall. This picture was taken during the early excavations



Photographers in the site

Photographers are covering the visit of the Greek Prime Minister.



Details of the perimeter wall

Photo taken during the excavations of the 500-meter perimeter wall of the tumulus.



The 500-meter perimeter wall

Large blocks of white marble are surrounding the tomb of Amphipolis.



The perimeter wall - close look

The wall consists of limestone blocks clad in marble. The marbles come from Thasos, an island of North Aegean. It's the same type of marble used for the sculpture of Lion of Amphipolis.



The wall of the tomb

Part of the high wall (3 meters height, 500 meters circumference), during the early excavations in 2013.



http://www.theamphipolistomb.com/wall

 

SASKPOWER CEO RESIGNS FOLLOWING INVESTIGATION INTO SMART METER “CATASTROPHE”. SMART METER FIRES HAVE ALSO BEEN REPORTED IN THE US AND FORCED UTILITIES TO REPLACE HUNDREDS OF THOUSANDS OF METERS.

SaskPower CEO resigns following investigation into smart meter “catastrophe”.  SMART METER FIRES HAVE ALSO BEEN REPORTED IN THE US AND FORCED UTILITIES TO REPLACE HUNDREDS OF THOUSANDS OF METERS.




SaskPower CEO Robert Watson has resigned — without severance — after an investigation into “smart” meter fires throughout Saskatchewan.
As reported in late July, following a series of fires throughout Saskatchewan, Canada, “SaskPower ordered to remove all 105,000 smart meters in the province.”

On October 27th, the Government of Saskatchewan released the results of a scathing review on the smart meter “debacle” which is now commonly being referred to as a “catastrophe.”  The  report concluded that “customer safety was not given enough priority.”

SaskPower CEO Robert Watson resigned his position immediately following the release of the report on the smart meter program.

Findings from the investigation
According to the government’s review:

“The primary issue of catastrophic meter failures which prompted the AMI program to be halted was not identified as an initial program risk.  When additional information about smart meter fires from other sources came to light, the risk of catastrophic meter failures did not prompt an independent reevaluation of the risk related to Sensus smart meters.”

Additional key findings:

Moisture and contaminants getting inside the meters were a major factor in the meter fires.

There is no evidence to indicate the fires were the result of improper installation or hot sockets.

SaskPower did not adequately consider the potential for significant meter failures resulting in damage to homes.

VIDEO: SaskPower CEO Robert Watson resigns amidst smart meter “catastrophe”
Jack Ritenburg, an electrical engineer and head of Ritenburg & Associates concluded that moisture and contaminants inside the meters was the cause of the smart meter fires.  He also concluded that “water intrusion due to holes in meter boxes, ‘hot socket’ conditions in the meter box and over voltage in the distribution system” or other “external factors” were not the cause of the fires as previously claimed by the manufacturer:

Jack Ritenburg, an electrical engineer and head of Ritengurb and Associates, reports on the suspected causes behind the SaskPower smart meter fires.
According to the independent fire investigation report:

“There was significant precipitation in the previous thirty days for all of the fires. There was significant precipitation in five of the fires within the preceding two days. The remaining three fires had light precipitation within the preceding two days.  There is evidence that moisture and contaminants have been getting into the meters and possibly being trapped.”

“Hot socket issues have been flagged as a possible reason for some of the meter failures. … [W]e feel that a hot socket condition resulting in a destructive meter failure and fire are not likely.”

“Sensus has claimed that some of the smart meter fires were caused by utility over-voltage. … We have not found any evidence to support that a significant over-voltage occurred and resulted in a destructive meter failure.”

The photo below shows electrical arcing inside a smart meter that was taken out of service under the category “Display Error.”  This failure is in the same location as smart meters which suffered a catastrophic failure.



The following photo (below) shows a meter that was taken out of service by SaskPower that has staining from smoke and evidence of moisture at the bottom of the meter.  This meter had not yet suffered a catastrophic failure.




The fire investigation report concluded with the following statements:

“In view of the above, we are of the opinion that moisture and contaminants within the meter has been a major factor in the meter failures and ensuing fires.”

“As there is some danger with destructive meter failures and potential resulting fires, we recommend that the existing Sensus Generation 3.3 meters be replaced as soon as possible.  As the existing meter fires have had a close relationship to precipitation levels, SaskPower might wish to consider replacement no later than the end of winter and before the spring thaw and spring rains begin.”

Just to be clear, the fire investigation report reveals that the principal problem is  primarily rain water  (and/or condensation along with other contaminants) that gets into the smart meters themselves, causing arcing across electronic components with eventual catastrophic failure of the meter with a possible explosion or fire.  Furthermore, based upon a review of the investigative report, it is clear we basically have “cheap” meters with a number of design deficiencies which includes uninsulated busbars in close proximity to printed circuit boards and which further allow easy entry of water and dust into the meter enclosures.
Bottom line, … the existing smart meters on people’s homes still present a fire risk in Saskatchewan and elsewhere.  In addition, these types of problems would not occur with traditional analog meters that do not contain fragile electronic components.

Smart meters a catastrophe

As a supplement, this website will quote a portion of an October 28, 2014, article in the Leader-Post entitled SaskPower smart meters a ‘catastrophe’:
“Lest there still be any doubt how badly bungled the SaskPower smart meter debacle was, consider how frequently lawyers, technical specialists and others used the word ‘catastrophic’ in their joint review released Monday.

‘The primary issue of catastrophic meter failures which prompted the AMI (Advanced Meter Infrastructure) program to be halted was not identified as an initial program risk,’ stated the $500,000 Crown Investments Corp. (CIC) report entitled Smart Meter Review.

‘When additional information about smart meter fires from other sources came to light, the risk of catastrophic meter failures did not prompt an independent re-evaluation of the risk related to Sensus smart meters.

An escalation of the risk assessment could have prompted additional investigation, testing and either closer monitoring of installed meters or a pause to the rollout of smart meters until issues were better understood.’

‘Catastrophic’ in Monday’s report refers to not just the eight fires started by the smart meters, but occasions when things like smoking in the smart meters – largely due to moisture or debris getting inside what should have been a sealed casing – might have easily led to fires.  In all, there were some 359 incidents of meter failure, although the majority were for things like improper readings.
Yet according to the review – [comprised] of three separate reports by Ritenburg and Associates looking into technical issues, Robertson Stromberg commissioned to look at legal matters, and PwC asked to review procurement and contract management – little or no thought was ever given to the inherent risk of catastrophic events.”




SASKPOWER CEO RESIGNS FOLLOWING INVESTIGATION INTO SMART METER “CATASTROPHE”. SMART METER FIRES HAVE ALSO BEEN REPORTED IN THE US AND FORCED UTILITIES TO REPLACE HUNDREDS OF THOUSANDS OF METERS.





SaskPower CEO resigns following investigation into smart meter “catastrophe”.  SMART METER FIRES HAVE ALSO BEEN REPORTED IN THE US AND FORCED UTILITIES TO REPLACE HUNDREDS OF THOUSANDS OF METERS.




SaskPower CEO Robert Watson has resigned — without severance — after an investigation into “smart” meter fires throughout Saskatchewan.
As reported in late July, following a series of fires throughout Saskatchewan, Canada, “SaskPower ordered to remove all 105,000 smart meters in the province.”

On October 27th, the Government of Saskatchewan released the results of a scathing review on the smart meter “debacle” which is now commonly being referred to as a “catastrophe.”  The  report concluded that “customer safety was not given enough priority.”

SaskPower CEO Robert Watson resigned his position immediately following the release of the report on the smart meter program.

Findings from the investigation
According to the government’s review:

“The primary issue of catastrophic meter failures which prompted the AMI program to be halted was not identified as an initial program risk.  When additional information about smart meter fires from other sources came to light, the risk of catastrophic meter failures did not prompt an independent reevaluation of the risk related to Sensus smart meters.”

Additional key findings:

Moisture and contaminants getting inside the meters were a major factor in the meter fires.

There is no evidence to indicate the fires were the result of improper installation or hot sockets.

SaskPower did not adequately consider the potential for significant meter failures resulting in damage to homes.

VIDEO: SaskPower CEO Robert Watson resigns amidst smart meter “catastrophe”
Jack Ritenburg, an electrical engineer and head of Ritenburg & Associates concluded that moisture and contaminants inside the meters was the cause of the smart meter fires.  He also concluded that “water intrusion due to holes in meter boxes, ‘hot socket’ conditions in the meter box and over voltage in the distribution system” or other “external factors” were not the cause of the fires as previously claimed by the manufacturer:

Jack Ritenburg, an electrical engineer and head of Ritengurb and Associates, reports on the suspected causes behind the SaskPower smart meter fires.
According to the independent fire investigation report:

“There was significant precipitation in the previous thirty days for all of the fires. There was significant precipitation in five of the fires within the preceding two days. The remaining three fires had light precipitation within the preceding two days.  There is evidence that moisture and contaminants have been getting into the meters and possibly being trapped.”

“Hot socket issues have been flagged as a possible reason for some of the meter failures. … [W]e feel that a hot socket condition resulting in a destructive meter failure and fire are not likely.”

“Sensus has claimed that some of the smart meter fires were caused by utility over-voltage. … We have not found any evidence to support that a significant over-voltage occurred and resulted in a destructive meter failure.”

The photo below shows electrical arcing inside a smart meter that was taken out of service under the category “Display Error.”  This failure is in the same location as smart meters which suffered a catastrophic failure.



The following photo (below) shows a meter that was taken out of service by SaskPower that has staining from smoke and evidence of moisture at the bottom of the meter.  This meter had not yet suffered a catastrophic failure.




The fire investigation report concluded with the following statements:

“In view of the above, we are of the opinion that moisture and contaminants within the meter has been a major factor in the meter failures and ensuing fires.”

“As there is some danger with destructive meter failures and potential resulting fires, we recommend that the existing Sensus Generation 3.3 meters be replaced as soon as possible.  As the existing meter fires have had a close relationship to precipitation levels, SaskPower might wish to consider replacement no later than the end of winter and before the spring thaw and spring rains begin.”

Just to be clear, the fire investigation report reveals that the principal problem is  primarily rain water  (and/or condensation along with other contaminants) that gets into the smart meters themselves, causing arcing across electronic components with eventual catastrophic failure of the meter with a possible explosion or fire.  Furthermore, based upon a review of the investigative report, it is clear we basically have “cheap” meters with a number of design deficiencies which includes uninsulated busbars in close proximity to printed circuit boards and which further allow easy entry of water and dust into the meter enclosures.
Bottom line, … the existing smart meters on people’s homes still present a fire risk in Saskatchewan and elsewhere.  In addition, these types of problems would not occur with traditional analog meters that do not contain fragile electronic components.

Smart meters a catastrophe

As a supplement, this website will quote a portion of an October 28, 2014, article in the Leader-Post entitled SaskPower smart meters a ‘catastrophe’:
“Lest there still be any doubt how badly bungled the SaskPower smart meter debacle was, consider how frequently lawyers, technical specialists and others used the word ‘catastrophic’ in their joint review released Monday.

‘The primary issue of catastrophic meter failures which prompted the AMI (Advanced Meter Infrastructure) program to be halted was not identified as an initial program risk,’ stated the $500,000 Crown Investments Corp. (CIC) report entitled Smart Meter Review.

‘When additional information about smart meter fires from other sources came to light, the risk of catastrophic meter failures did not prompt an independent re-evaluation of the risk related to Sensus smart meters.

An escalation of the risk assessment could have prompted additional investigation, testing and either closer monitoring of installed meters or a pause to the rollout of smart meters until issues were better understood.’

‘Catastrophic’ in Monday’s report refers to not just the eight fires started by the smart meters, but occasions when things like smoking in the smart meters – largely due to moisture or debris getting inside what should have been a sealed casing – might have easily led to fires.  In all, there were some 359 incidents of meter failure, although the majority were for things like improper readings.
Yet according to the review – [comprised] of three separate reports by Ritenburg and Associates looking into technical issues, Robertson Stromberg commissioned to look at legal matters, and PwC asked to review procurement and contract management – little or no thought was ever given to the inherent risk of catastrophic events.”


Fire Concerns Lead PECO to Halt Smart Meter Installations

PHILADELPHIA -
After at least two fires and over a dozen incidents of overheating, PECO is halting its controversial smart meter installation program.
The stunning announcement came Wednesday morning as FOX 29 Investigates pressed the company over a spate of recent incidents, including fires in Bucks County.
PECO had plans to install 1.6 million of the so-called smart meters.
The digital units are designed to conserve energy and help customers monitor their usage.
But over the past few months, concerns and complaints have grown that the installation of these new meters have sparked fires, including two recently in Bucks County.
Now, PECO is stopping installations as it takes a hard look at the meters and prepares to put safety measures in place.

"Is PECO concerned that it has 186,000 meters in people's homes here that may represent a danger to them and their families?" FOX 29's Jeff Cole asked.
"This situation is obviously being taken very seriously," PECO spokeswoman Cathy Engle Menendez answered. "We have 186,000 meters, the vast majority of which are performing well., but we've had 15 cases where there have been issues."
Of the 15 incidents, PECO says it is still investigating nine. Six, they claim, were not caused by the smart meters.
Along with the abrupt halt of the meter installations, PECO says it will install warning and shutdown components on those already in place.
In his video report for Wednesday's FOX 29 News at 10, Cole spoke to some of the property owners who were impacted by the fires.
If you want your PECO meter or equipment inspected, officials there want you to give them a call. The number is 855-741-9011.