MEC&F Expert Engineers

Thursday, November 13, 2014

KEEP SPACE HEATERS AT LEAST THREE FEET AWAY FROM COMBUSTIBLES TO PREVENT FIRES AND DEATH




KEEP SPACE HEATERS AT LEAST THREE FEET AWAY FROM COMBUSTIBLES



The nonprofit National Fire Protection Association (NFPA) and the U.S. Fire Administration (USFA) are teaming up to reduce the risk of home heating fires this December, January and February, when half of all U.S. home heating fires occur. Through their joint fire safety campaign, “Put a Freeze on Winter Fires,” both organizations urge everyone to use extreme caution when heating their homes this winter, and to keep anything that can burn far away from heating equipment.

Placing a heat source too close to things that can burn is a leading cause of home heating equipment fires, and it’s the leading cause of related fire deaths; half of all home heating fire deaths result from heating equipment being placed too close to things that can burn.


NFPA and USFA strongly encourage people to keep things that can burn, such as paper, bedding or furniture, at least three feet away from heating equipment, and to create a three-foot “kid-free zone” around them as well. By taking these and other simple safety precautions, everyone can significantly reduce their risk to associated fires.

Winter fires are preventable! For more heating fire safety advice from NFPA and USFA’s “Put a Freeze on Winter” campaign, visit www.nfpa.org/winter.



Metropolitan Engineering, Consulting & Forensics (MECF)

Providing Competent, Expert and Objective Investigative Engineering and Consulting Services
P.O. Box 520
Tenafly, NJ 07670-0520
Tel.: (973) 897-8162
Fax: (973) 810-0440
We are happy to announce the launch of our twitter account. Please make sure to follow us at @MetropForensics or @metroforensics
To unsubscribe from future technical blogs and announcements, please reply to this email with the word “unsubscribe” in the subject line.

Metropolitan appreciates your business.
Feel free to recommend our services to your friends and colleagues.
 

TIME TO GET HEATING EQUIPMENT CLEANED AND INSPECTED - FOR YOUR FAMILY'S SAFETY AND YOUR PROPERTY PROTECTION



Time to get heating equipment cleaned and inspected



As temperatures drop and home heating systems kick into gear, remember to get your home heating systems inspected and cleaned as soon as possible.  That’s a key message from the nonprofit National Fire Protection Association (NFPA) and the U.S. Fire Administration (USFA), who are teaming up to reduce the risk of home heating fires this December, January and February, when half of all U.S. home heating fires occur.
According to NFPA, home heating equipment is the second leading cause of U.S. homes fires; failure to clean heating equipment is the most common reason for these fires.
Through their joint winter fire safety campaign, “Put a Freeze on Winter Fires,” NFPA and USFA urge everyone to get their home heating systems inspected and cleaned annually by a trained professional, preferably before the start of the season. This will ensure that your home heating system is working properly, and can significantly reduce your risk to associated fires.  If you have a chimney, make sure it’s also inspected and cleaned, if necessary, by a trained professional.  Creosote - a sticky, oily, combustible substance created when wood does not burn completely - rises into the chimney as a liquid and deposits on the chimney walls, causing one-quarter of all home heating  fires.
Winter fires are preventable! For more heating safety advice from NFPA and USFA’s “Put a Freeze on Winter” campaign, visit www.nfpa.org/winter.


Metropolitan Engineering, Consulting & Forensics (MECF)

Providing Competent, Expert and Objective Investigative Engineering and Consulting Services
P.O. Box 520
Tenafly, NJ 07670-0520
Tel.: (973) 897-8162
Fax: (973) 810-0440
We are happy to announce the launch of our twitter account. Please make sure to follow us at @MetropForensics or @metroforensics
To unsubscribe from future technical blogs and announcements, please reply to this email with the word “unsubscribe” in the subject line.

Metropolitan appreciates your business.
Feel free to recommend our services to your friends and colleagues.



FLUOR ENTERPRISES FAILED TO MONITOR AND MAINTAIN LIQUID PROPANE IN FEMA TRAILERS. ITS INSURER AND NOT THE SUBCONTRACTOR MUST PAY FOR THE PROPERTY DAMAGE AND DEATHS DURING KATRINA



FLUOR ENTERPRISES FAILED TO MONITOR AND MAINTAIN LIQUID PROPANE IN FEMA TRAILERS.  ITS INSURER AND NOT THE SUBCONTRACTOR MUST PAY FOR THE PROPERTY DAMAGE AND DEATHS DURING KATRINA



 This case involves an insurance-coverage dispute. Fluor Enterprises, Inc. (“Fluor”) contracted with the Federal Emergency Management Agency (“FEMA”) to manage the delivery and installation of FEMA trailers following Hurricanes Katrina and Rita. Fluor subcontracted with MMR Constructors, Inc. (“MMR”) to haul and install the trailers. As part of the agreement between Fluor and MMR, MMR agreed to indemnify Fluor for any injuries arising, directly or indirectly, out of the parties’ contract itself or out of MMR’s acts or omissions. As relevant here, Fluor insured its liabilities through Westchester Fire Insurance Co. (“Westchester”) and MMR insured its liabilities through Liberty Mutual Insurance Co. (“Liberty”). 

A flash fire occurred in one of the trailers that MMR had hauled and installed, injuring the trailer’s inhabitant and killing her friend.  The fire was caused in part by the failure of the trailer’s liquid-propane (“LP”) detector to alarm. The injured parties sued Fluor, MMR, and their insurers. Those suits settled. Now, in this case, Liberty seeks reimbursement for its settlement payments from Westchester, arguing that MMR was not responsible for any of the injuries. The issue before us is whether MMR was required, as part of its contract with Fluor, to test the LP detector and whether its failure to do so was a but-for cause of the injuries. 

Following a bench trial, the district court concluded that MMR was under no such obligation. Consequently, the district court determined that MMR was under no obligation to indemnify Fluor, defeating coverage, and that Fluor was not covered under an additional-insured provision contained in MMR’s insurance policies with Liberty. We conclude that MMR was not obligated to test any trailer’s LP detector and the record supports the conclusion that Fluor did not in fact direct MMR to do so with respect to the particular trailer in which the fire occurred. Accordingly, the Fifth Circuit Court of Appeals AFFIRMED the judgment of the district court.



THE AMPHIPOLIS TOMB SURROUNDING WALL - A MARVEL OF GREEK ENGINEERING BUILT 2,300 YEARS AGO

 

THE AMPHIPOLIS TOMB SURROUNDING WALL - A MARVEL OF GREEK ENGINEERING BUILT 2,300 YEARS AGO

 

The surrounding Wall

The surrounding wall of the Tomb is 500 meters long and it is almost a perfect circle. The diameter of the Tomb is 158.4 meters and this is the standard of Deinokratis. It was him that constructed the walls of Alexandria, which are 15.840 meters long. This beautiful surrounding wall, which is almost intact, reaches 3 meters high and is covered by cornice. The marbles come from the island of Thassos.


Missing pieces of the Tumulus surrounding wall have been located

More than 500 missing pieces from the surrounding wall have been found near the place where the Lion of Amphipolis sits. More than 100 stones were discovered just a couple of days ago in Lake Kerkini, where the pieces were transferred in 1936 by the company Ulen, who were in-charge of the construction for the Dam at Kerkini.






Details of the Wall

The marble of the Wall was brought from the island of Thassos and is in almost perfect condition.



Inside the corridor

The photo depicts the base of the wall, the blocks of marble and the base of the wall, just behind the wall. It's impressive to look at the top, to realize the actual depth of the excavations.



The cornice of the Wall

The surrounding wall is covered by an amazing cornice which looks almost intact, even if it was constructed 2.300 years ago.



Multiple levels of marble blocks

As we can see in the photo, the perimeter consists of multiple levels of stone. Total height of the perimeter wall is 3 meters.



Excavations of the perimeter

The tomb of Amphipolis is surrounded by a 500-meter marble wall. This picture was taken during the early excavations



Photographers in the site

Photographers are covering the visit of the Greek Prime Minister.



Details of the perimeter wall

Photo taken during the excavations of the 500-meter perimeter wall of the tumulus.



The 500-meter perimeter wall

Large blocks of white marble are surrounding the tomb of Amphipolis.



The perimeter wall - close look

The wall consists of limestone blocks clad in marble. The marbles come from Thasos, an island of North Aegean. It's the same type of marble used for the sculpture of Lion of Amphipolis.



The wall of the tomb

Part of the high wall (3 meters height, 500 meters circumference), during the early excavations in 2013.



http://www.theamphipolistomb.com/wall