THE
PLANNING AND CONSTRUCTION PHASES OF A GAS PIPELINE PROJECT
The construction
of any energy-related project is regulated by FERC. There are some strict procedures that must be
followed during the planning, design, installation and maintenance of the
energy infrastructure. Of course we know
that the feds have been sleeping at the wheel for some of these projects, especially
the pipeline ones. Only after the
explosions and leaks and fires started happening did they force the pipeline
companies to replace the pipelines and upgrade their design and construction standards.
Construction Work on Main Pipeline and Laterals
Stage
of Construction
|
Install Environmental Measures
|
Clearing
|
Grading
|
Trenching
|
Stringing
|
Welding
|
Lowering In
|
Backfill
|
Rough Cleanup
|
Final Cleanup
|
Restoration
|
Construction Work at Compressor Stations
Site Preparation
|
||
SESCD
|
||
Grading & Site Preparation
|
||
Chat Surfacing
|
||
Roadway
|
||
Removal of old fence and installation of new
fencing
|
||
Protective Bollards
|
||
Disposal
|
||
Building and Equipment Foundations
|
||
Install Foundations
|
||
Grouting
|
||
Station Piping Systems
|
||
Gulf South Meter Station Tie-in and Pipeline
|
||
Yard Piping
|
||
Unit Piping
|
||
Seal Gas System
|
||
Gas Turbine
|
||
Power Gas System
|
||
Compressed Air system
|
||
Lube Oil System Install
|
||
Utility Systems and Low Pressure Yard Piping
|
||
Hydrostatic Testing
|
||
Lube Oil System Flush
|
||
Major Equipment
|
||
Gas Turbine/ Compressor Package
|
||
Oily Water Underground Sump Tank
|
||
Structures and Buildings
|
||
Structural Steel
|
||
Compressor Building
|
||
New Power Control Room (PCR) Building
|
||
New Paralleling Switchgear Enclosure Building
|
||
Electrical and Instrumentation
|
||
New PCR Building Electrical Equipment
|
||
Paralleling Switchgear Enclosure Bldg. Equipment
|
||
Existing PCR Building Electrical Equipment
|
||
New Turbine Compressor Unit #4 Elect Equipment
|
||
New Gas Cooler Electrical Equipment
|
||
New Compressor Building Electrical Equipment
|
||
Fire Protection and Gas Detection Systems
|
||
Smoke Detection System
|
||
Communications
|
||
Station Lighting
|
||
Station Security System Upgrades
|
||
Grounding/Cathodic Protection
|
||
Hazardous Area Classification
|
|
|
Conduit Installation
|
||
Wiring and Fixtures
|
||
Other
|
||
Insulation
|
||
Equipment Startup and Commissioning
|
||
Coating/Painting
|
|
|
Field Joint Coating
|
|
|
Construction Clean-up and Site Restoration
|
||
Revised PPE Requirements
|
||
Perimeter Trenching
|