MEC&F Expert Engineers

Monday, October 24, 2016

HOW TO PREVENT AN OVERHEATED BOILER OR FURNACE INCIDENT





Explosion of an overheated boiler

HOW TO PREVENT AN OVERHEATED BOILER OR FURNACE INCIDENT 




https://sites.google.com/site/metroforensics3/cause-and-contributing-factors-of-heating-boiler-failure
 

We received quite a few inquiries regarding the prevention of the overheating of a boiler or furnace that could lead to an explosion. If you have baseboard heating system in your home, then you do have a water heating boiler system like the one we describe in this blog. We briefly address this issue as a service to the communities we serve.

An overheated boiler is where the heating unit reaches an exceedingly high temperature and pressure, and the high temperature and pressure safety switches will not operate. This condition, also known as “runaway boiler”, is very hazardous to building occupants and emergency responders, including the neighbors. It is caused by the concurrent failures of redundant safety controls that maintain safe temperature, pressure, gas supply (if the boiler is a gas unit), and water supply. 

When boilers or furnaces overheat, it can cause a failure of the safety controls that are attached or very close to the body of the boiler. The failure of the safety controls will most definitely cause an explosion of the boiler. See images above and below.




Exploded boiler on its side


There are several types of boilers and furnaces available: hot water boilers, steam boilers, warm air furnaces. These are briefly described below.


Basic Components of a Hot Water Boiler


The basic components of a hot water boiler are (refer to the attached schematic):


· A gas valve where the fuel comes in


· Water feed gate valve and the associated pressure relief valve (PRV)


· The water circulator pump


· The pressure relief valve


· The air vent


· The Aquastat control that is used to regulate the water temperature


· The expansion tank


· The drain valve


· The vent flue


· The burners


· The pressure and temperature gauges/control valves





The water heating boiler operates as follows:


The boiler is filled up with water and maintains 12 PSI (pounds per square inch) water pressure. The air is bled out of the system zones. The circulator pump will not move water through the baseboard loops if air is in the system. The expansion tank maintains system pressure and absorbs water expansion and contraction from heating and cooling.





How water boilers risk over-pressurization when there is a failure of the pressure relief valve and at least one other safety control. The boilers are connected to closed piping systems with the potential to build up excessive pressures when water temperatures rise without control beyond the safe operating range which is up to 250 degrees F. The typical maximum operating pressure of a residential boiler is 20 PSI. For an industrial boiler, the max operating pressure is 50 PSI. Pressures that continue to rise above the above safety ratings can result in a violent explosion when the boiler vessel fails.


Based on our forensic investigations, the boiler failure incidents occurred when safety controls failed to operate as designed due to mechanical failure (i.e., aquastat shorting out, damaged wiring, or failed gas valve). Other causes of failure include human intervention events, including: removing or adding a pressure relief valve to stop water leaks; wiring errors; opening a gas valve in bypass (manual) mode.


A “Dry Fire Boiler” condition can occur when burners fail to shut off and the relief valve opens to release excessive pressure. The remaining water in the system can boil away if water supply to the PRV is shut off or the PRV is stuck closed. Without water, the boiler can reach extreme temperatures. See image below of an overheated firebox of a boiler that was heating without water.






You should never introduce water in an overheated boiler. If cooler water is introduced, it flashes into steam when it comes into contact with the heated surfaces inside the boiler. This “flash steam” significantly increases the pressure in the boiler as the steam energy is released. This reaction can result in a cracked boiler or violent explosion.


Owners of Flooded Homes Beware: It is very important to note that the heating controls exposed to flood water can fail after being dried and placed back in operation. Any controls exposed to flood water must always be replaced.

_____________________________________________________________


Did you know?


NEVER ADD WATER TO AN OVERHEATED BOILER. WATER COULD FLASH INTO STEAM AND CAUSE SEVERE INJURY OR DEATH


_____________________________________________________________

Steam Boiler


The basic components of a steam boiler are as follows:


· The combination gas valve, regulator and shut-off cock


· The low water cutoff switch


· The water level sight glass


· The pressure limit control


· The temperature and pressure relief valve


· The exhaust vent damper


· The electronic ignition


· The access door to the burners/pilot






Steam boilers can become over-pressurized when there is a failure of the pressure relief valve and at least one other control. Although the steam boiler is connected to an open piping system with radiators at the endpoints, the radiator air vents close at normal operating temperatures. Excessive pressure will build up if the gas valve or safety controls fail. Boiler pressures that exceed 15 PSI due to a failure of the PRV can result in a violent explosion when the boiler vessel fails.


Investigated boiler failure incidents took place when safety controls failed to operate as designed due to mechanical failure (i.e., blocked siphon tube (“pigtail”), failed gas valve, defective low level cutoff (LWCO) or though human intervention. Some examples of human intervention are: removing and adding a PRV to stop water leaks, wiring errors, opening a gas valve in bypass (manual mode).

As we said earlier, the leading cause of boiler failure is the low water condition caused by failure of the LWCO device. The following factors can lead to a breakdown or malfunctioning of the LWCO.







Float Type LWCO w/ Manual Reset (Steam or Water Boiler)

· Mineral deposits (calcium, etc.) typically contained in the water cause fouling of the device.


· Improper or faulty wiring, either permanent or during testing are causing malfunctioning of the LWCO.


· Normal wear and tear of the device can lead to failure.


· Luck or proper maintenance such as purging.


· Loss of Water due to leaks in piping, steam traps, etc.





LWCO switch stuck in the up position. This led to a boiler overheating, introduction of water into the overheated boiler, steam flashing and subsequent explosion


Warm Air Furnace


If you have a typical HVAC system, then you have a warm air furnace as part of the system. The basic components of a warm air furnace include:


· The gas valve


· The gas burners


· The blower and blower motor


· The furnace chamber


· The blower fan and limit control


· The gas shut off valve


· The heat exchanger


· The pilot assembly of hot surface ignitor


· The thermocouple or flame sensor

A warm air furnace is at risk of overheating when gas control failures produce temperatures exceeding the maximum design. An overheated furnace is a fire hazard and may crack, allowing carbon monoxide to enter the building through the duct work. For HVAC installations, if an A/C coil fails due to soft solder melting when high temperatures or fire compromises the system, potentially lethal toxic gas can be created. As with the other boilers, any controls exposed to flood water must always be replaced.


In a boiler explosion incident, the homeowner was experiencing trouble with the boiler ignition system, and switched the automatic gas valve to manual operation. The constant flow of gas into the boiler led to a significant increase in temperature and pressure that caused an overheating (runaway) condition. Fifteen minutes after the heating unit was turned on, the boiler exploded.





Pieces of the boiler scattered in the basement






Automatic gas valve was switched “ON” to manual operation, feeding the boiler with a steady flow of gas. This led to the overheating and subsequent explosion of the boiler. This particular boiler had no means to relieve pressure after overheating.

Several months prior to the explosion, the customer had a combination pressure reducing (water feed) valve and pressure relief valve control replaced. When the servicing company performed the repair, the combination valve was replaced with only a pressure reducing (water feed) valve. As a result, the boiler no longer had a relief valve to relieve excess pressure. Whenever a combination valve is replaced with a single pressure reducing (water feed) valve, a separate relief valve must also be installed. Boilers are equipped with designated tap holes for inserting a separate pressure relief valve.

In another incident, a homeowner had a thermal expansion tank installed on the supply line to the hot water boiler. The new expansion tank was erroneously connected to the outlet of the pressure relief valve, plugging it. The boiler had no way of relieving pressure and created a “runaway” condition.





Note the expansion tank erroneously connected to the outlet of the PRV valve. This was the cause of boiler explosion.

Based on the thousands of boiler maintenance, repairs and failure investigations we conducted over the years, we can tell you with certainty that the leading cause of heating boiler failure is low water. Most of the time, the low water fuel cutout safety switch has failed and this led to the overheating and failure of the boilers. There are always early sign of boiler failure, if you know where to look and how to interpret them. For example, small leaks could appear in the boiler vessel or the piping. These water leaks may not look serious, but they should never be ignored as they will most certainly lead into greater problems. Most of the time, some low cost items, such as a pressure relief valve, are defective or are old and need replacement. If they are not replaced, significant losses could occur.

If an insurer has refused to insurer your boiler, then this should be a good clue that it is time to replace it or repair it. Insurers, like The Hartford Steam Boiler Inspection and Insurance Company, Travelers, and others have a very good handle on boiler safety. When they stay away from a piece of equipment, please take the hint.





Above is a photo of a valve that was installed incorrectly. In fact, the inlet and outlet were stamped on the valve, so there is no excuse for such error. Mistakes are more frequent than you think. It is that our inspections help caught them prior to any damage occurring.



Why Boiler Failures can be Dangerous


Water boils at atmospheric pressure at 100o C (212o F). When placed under pressure, the water can be heated to extremes without flashing to steam. The typical expansion rate for 1 cubic foot of water is 1,700 cubic feet of steam. This amazing expansion rate is the reason that the boiler explosions are so powerful. Imagine this amount of steam to exit from a small pipe break under tremendous pressures. The routinely inspected water heater holds 119 gallons (16 cubic feet) of water. It is really a small bomb due to this massive energy release; in the past (during the industrial revolution between the 1800s and early 1900s) thousands of people died from such explosions. See below the results from a failed relief valve.





Boiler Inspection and Maintenance


The following provide important recommendations for heating boiler inspection, maintenance, and operation prior to the heating season. Low pressure boilers are inspected annually while in operation and internally every 3 years, if construction permits:


1. Perform an external exam for leaks. Many times we find that the leakage is caused by failure to remove hardness from inside the boiler; then the hardness expands during boiler heating, pushing apart the boiler sections and causing leakage.


2. Perform an evaluation of all safety device function.


3. Test all high temperature and high pressure switches.


4. Insulate water lines that are exposed to freezing temperatures to avoid pipe freeze-ups. Quite a few of these freeze ups occurred this past winter and another round of equally severe winter is forecast. We have our fingers crossed.


5. The safety relief valves or devices are crucial devices that must be tested very frequently, ideally every month. A malfunctioning safety valve will cause the boiler fail. If the relief valve does not properly function, then the temperature control will fail to properly control temperature. The water heater will heat unchecked until catastrophic failure occurs.


6. All other valves, gauges, pressure and temperature control instruments must be inspected for proper functioning.


7. Due to constituents found in the water, we get sediment built up pretty much everywhere in the boiler, including the sight (or gage) glass used to observe the water level. The water level sight glass should be cleaned from the accumulated water impurities and scale.


8. Disassemble the low water fuel cutoff and make-up water feeding devices. All parts should be thoroughly flushed, cleaned and reconditioned as required, then tested and evaluated before the boiler is put into regular service. While in service the devices should be tested once a week for steam boilers and once a month for hot water boilers.


9. All leaking pipes, valves, connections, etc. must be repaired or replaced to prevent water loss and property damage.


10. The boiler burner should be cleaned and adjusted to provide maximum burning efficiency.


11. All the internal surfaces of the boiler should be cleaned of all the water impurities that accumulate over time. These impurities inside the boiler are the cause of corrosion, cracking, deterioration and even explosion of the boiler.


12. A chemical water treatment should be used to minimize built-up of scale and other deposits and to slow down or minimize corrosion.


13. Ensure that all other equipment associated with the boiling system work properly.


14. Maintain a record book of boiler operation, maintenance or repairs. Some boilers have failed because technicians did not know what another tech had done to the boiler.

Regarding pressure vessels, most mechanical codes require that are inspected once every three years. This inspection requires a test of:


· Safety relief devices


· Temperature and pressure controls


· External exam to check for leaks


· Testing to verify thickness of the vessel body


We commonly see leaking and corroded boilers during many of our inspections, especially for older boilers. Unfortunately, even with a regular inspection program, people just ignore proper maintenance and operation. Just like our cars, some people are good at maintaining and some people are simply bad. We also observe leaking steam from the spindle, and many steam and water connections are also found leaking. The mud drums are another area where we observe corrosion and leakage. See figure below.








We have seen situations where there is very little monitoring of boilers in schools and municipalities on a regular basis, other than the inspector doing his annual inspection. This has led to leaks and other problems with the boiler efficiency and operation. As we wrote in the beginning, the most frequently found deficiencies are associated with the low water fuel cut offs, safety and relief valves are stuck, and high pressure and temperature switches are not often installed.


 It appears that the boiler owners believe that the service technician who may maintain their boiler will also test for the operation of the safety devices. We have found that this is not true, as the technician will only perform the service of the combustion and burner fuel systems, change the fuel filters, clean the fuel pumps and nozzles, check the igniter, vacuum the gas passes of the boiler, perform an efficiency test of the unit, etc.


Metropolitan Engineering, Consulting & Forensics (MECF)



Providing Competent, Expert and Objective Investigative Engineering and Consulting Services

P.O. Box 520
Tenafly, NJ 07670-0520
Tel.: (973) 897-8162
Fax: (973) 810-0440
E-mail: metroforensics@gmail.com
Web pages: https://sites.google.com/site/metropolitanforensics/
https://sites.google.com/site/metropolitanenvironmental/
https://sites.google.com/site/metroforensics3/
We are happy to announce the launch of our twitter account. Please make sure to follow us at @MetropForensics or @metroforensics

Metropolitan appreciates your business.
Feel free to recommend our services to your friends and colleagues.

CAUSE AND CONTRIBUTING FACTORS OF FAILURE OF TEMPORARY PIPE AND FLOWLINE CONNECTIONS AT FRACKING SITES






CAUSE AND CONTRIBUTING FACTORS OF FAILURE OF TEMPORARY PIPE AND FLOWLINE CONNECTIONS AT FRACKING SITES

https://sites.google.com/site/metropolitanforensics/cause-and-contributing-factors-of-failure-of-temporary-pipe-and-flowline-connections-at-fracking-sites

There have been a number of fluid discharge incidents and other accidents at gas production sites throughout the United States.  Based on our forensic investigations, quite a few of these releases have been caused by the failure of hammer unions or hammer joints.  Considering the skyrocketing increase in the number of these gas production sites, and since this is an on-going and recurring issue in the Oil & Gas, the chemical and steel industries, it is important to advice the insured and the insurers on the critical issue of mismatching and subsequent failure of hammer unions.


The danger of mismatched hammer unions
Hammer unions are connectors for flowline and temporary pipe installations.  Sometimes people use them instead of the flanged connection called for in the design. 
Property damage, injury and environmental release reports continue to come in involving pressurized lines and the unions used on these lines.  Workers have been observed mismatching unions.   In addition, workers have been observed hammering on lines while still under pressure.  Several accidents within the industries that use these unions, including fatalities, have occurred due to pressurized lines being improperly connected or being hammered on while under pressure.

FMC acquired the original Weco company that used to make these unions in the 1950s. The design is old, and used in steel and chemical plants, marine dredging vessels, strip mines and the oil & gas industry.  The problem is that Weco had made quite a few of these unions using different design standards they developed; in addition, there is no industry-wide standard.  There is a real potential for mismatch of the most commonly used hammer unions in the oil & gas, chemical and steel industries:  2-inch Figure 402, 2-inch Figure 602, 2-inch Figure 1002, and 2-inch Figure 1502.  The 2” Figure 1502 will make-up with 2” Figure 602 and 1002 and Guiberson 607.

You can eliminate the hazards involved with the mismatching of the various unions, by destroying 2″ 602 & 1002 Weco unions or old Guilberson Unions found in your operation and use only 1502 Thread Halfs (female sub) Use only Unions supplied by FMS and in good condition to ensure they hold rated pressure.


Recent representative releases caused by mismatched hammer unions at gas sites

·         A failed hammer union resulted in (21) gallon spill of production fluid that impacted the surface of the ground on the Well Pad. The spill was discovered around 3:40 PM on 11/30/2013.

·         One incident occurred when a 1502 wing nut male sub union holding a pressure sensor was attached to a 602 female union on the mud pump. The 1502 union and pressure sensor blew off the discharge of a mud pump. Another incident occurred when one service company’s 1502 wing nut for the male sub was made up to another service company’s 602 female half. While attempting to test the surface casing, the rams were closed and the standpipe pressure was slowly brought up. The intended test pressure was to be 1500 psi. When the pressure reached 1300 psi, the 1502 union stripped out and blew off and struck a third party service employee causing serious injury.

·         A spill occurred on 1/8/13.  An unknown amount of re-use water was released onto the ground.  A hammer union was leaking into the secondary containment of the frac tanks.

·         A spill occurred on 11/21/12 at 12:54 PM.  According to the incident report, the result of the release was due to a hammer union coming apart on the line to the production tank associated with the E Bunnell 6H Well. 

·         A drill crew was drilling ahead when a third party pressure sensor attached to the stand pipe stopped working. The sensor was made up to the standpipe with a size “602″ hammer union rated at 6,000 psi working pressure. The crew removed the faulty sensor and replaced it. The hammer union on the new pressure sensor had a size “1502″ wing nut rated to 15,000 psi. The “1502″ female threads in the wing nut appeared completely made up to the “602″ male threads coming off the standpipe

·         A spill occurred on 2/1/2014 when a dump line froze which caused a hammer joint to loosen and subsequently release production fluid to the ground.  Reported spill volume was 42 gallons. 







Figure 1.  FMC Hammer Union





The dangerous problem

The thread (or male half) of a 2” 602 and 1002 hammer union will make-up to the wing nut (or female half) of a 2” 1502 hammer union leading a worker to believe he has mated two compatible components that will withstand fluid pressures up to 6,000 psi.  As the threads on the two halves are of the same pitch and design, they will actually screw together.  However, because there is a 5/16” difference between the diameters of the thread and wing-nut halves described above, the two mismatched components will not actually hold high pressures very long.  The hammer unions will eventually separate.  When the union halves blow apart three immediate hazards are created:



1.                  The wing-nut becomes an 8 lb. Projectile that moves in an undetermined direction, maybe at personnel.

2.                  Uncontrolled release of high-pressure fluids that may or may not strike an employee in its path.

3.                  Uncontrolled release of potential toxic fluids (acids, oils, fuels, diesel base mud) that may cause harm to persons or the environment.





Figure 2.  Differences between the 1502 and the 602 female sub





These hammer union components have a history of failing under pressure due to incorrect matching of components (pressure ratings and/or incompatible geometry).

The above list is not meant to be all-inclusive and users should establish controls to ensure hammer union combinations are safe, especially when more than one manufacturer’s components are used.


The Recommended Procedure by the American Petroleum Institute

The recommended procedure (RP) alert by the API is intended to raise awareness of the incompatibility and dangers of these hammer unions.  Even though these parts mate up, they are likely to fail below the working pressure of the hammer union segments (male and female). Failures typically result in personnel injury or death in addition to extreme equipment damage.





Figure 3.  Compatible hammer unions.  Note the smaller diameter of the lips of the male sub.



The RP also describes a recommended procedural solution to the industry that will reduce the likelihood of a 2-inch Figure 402, 602, and/or 1002 hammer union component being made up inadvertently to a 2-inch Figure 1502 hammer union.

Additionally the RP describes and proposes an engineering solution to the industry that makes impossible the mating of female 2-inch Figure 402, 602, and/or 1002 subs with the wing nut of the 2-inch Figure 1502 hammer union.

It is important that all users and suppliers adopt the procedural solution as it could possibly be a number of years before the new hammer union designs are implemented and the original hammer unions taken completely out of service.

Briefly, the procedural proposals include using one or more of the following measures depending on the fleet or equipment package:

•        Replace all 2-inch hammer union components to a 2-inch Figure 1502.

•        Use Go/No-Go gauges on all 2-inch female subs to determine whether the component is acceptable for use with a 2-inch Figure 1502 male sub and nut.

•        Perform inspection and marking to ensure all hammer unions are repaired or removed from service as required. Marking should be either by stamping or branding and large enough to easily see.

•        Train all personnel on the hazards of mismatched hammer unions and include identification of all components, wear and tear, and out of service criteria.

•        Management of change process should be utilized.

•        Permit-to-Work (PTW) and/or Job Safety Analysis (JSA) should be used in all work requiring hammer unions.

•        Jobsite inventory of hammer union component.

•        Color-coding

The RP also notes that the engineering design solution is in three areas of the female sub:

1)      reduced thread major diameter,

2)      raised shoulder, and

3)      a mark indicating the design.

Other areas covered in the RP include mitigating the effects of mismatched components parting, as well as several general safety recommendations.

The dangers of mismatched hammer unions have been in the patch for far too long.  But by following the recommended procedural solution contained in this RP, as an industry, we can protect our workers to the best of our ability while using hammer unions. It is of the utmost importance that all employees are trained and retrained in the proper handling, use and make-up of hammer unions.





Figure 4.  Incompatible hammer unions.  Note the almost same diameter of the male and female lips.



Metropolitan Engineering, Consulting & Forensics (MECF)

Providing Competent, Expert and Objective Investigative Engineering and Consulting Services

P.O. Box 520

Tenafly, NJ 07670-0520

Tel.: (973) 897-8162

Fax: (973) 810-0440



We are happy to announce the launch of our twitter account.  Please make sure to follow us at @MetropForensics

To unsubscribe from future technical blogs and announcements, please reply to this email with the word “unsubscribe” in the subject line.



Metropolitan appreciates your business.

Feel free to recommend our services to your friends and colleagues.

We know you need to process damage claims quickly and knowing the facts is now faster than ever – within 24 hours of site visit.  Our Pegasos Forensic Investigation Services (PFIS) feature:

·                     Expert Forensic Investigators on-site.

·                     Defensible, Readable, Conclusive Reports.

·                     Fixed-Prices starting at $499 per chimney or roof inspection (volume discounts are also available).  Flood loss assessments start at $999.0.  HVAC equipment only inspections start at $299 for local (within one hour one-way drive) assignments.

·                     10-State Coverage Area.

All of our employees and associates are subjected to full FBI background investigations and security clearance.

CONSTRUCTION DEFECTS: ASSESSMENT, INVESTIGATION AND LITIGATION. Metropolitan Engineering, Consulting & Forensics (MECF)







CONSTRUCTION DEFECTS:  ASSESSMENT, INVESTIGATION AND LITIGATION.

Metropolitan Engineering, Consulting & Forensics (MECF)


A construction defect is generally defined as a defect or deficiency in the design, the construction, and/or in the materials or systems used on a project that may not be readily observable and results in a building, structure or component that is not suitable for the purpose intended. The term “construction defect” includes both design and construction defects that result in financial harm (either property damage or personal injury) to the owner or to a third party.


According to the Insurance and Risk Management Institute, a construction defect is generally speaking, a deficiency in the design or construction of a building or structure resulting from a failure to design or construct in a reasonably workmanlike manner, and/or in accordance with a buyer's reasonable expectation. The most dangerous defects have the capacity to fail, resulting in physical injury or damage to people or property. However, many defects present no increased risk of injury or damage to other property but nevertheless cause harm to the property owner in the form of loss of use, diminution in value, and extra expenses incurred while defects are corrected. This latter type of defect is often referred to as a passive defect.

Many states have more specifically defined the term "construction defect" for purposes of applying statutes that dictate processes for remedying and litigating construction defect claims. These statutory definitions vary by state. Nevada, for example, uses the term constructional defects and defines it as follows:

“Constructional defect” means a defect in the design, construction, manufacture, repair or landscaping of a new residence, of an alteration of or addition to an existing residence, or of an appurtenance and includes, without limitation, the design, construction, manufacture, repair or landscaping of a new residence, of an alteration of or addition to an existing residence, or of an appurtenance:
1. Which is done in violation of law, including, without limitation, in violation of local codes or ordinances;

2. Which proximately causes physical damage to the residence, an appurtenance or the real property to which the residence or appurtenance is affixed;

3. Which is not completed in a good and workmanlike manner in accordance with the generally accepted standard of care in the industry for that type of design, construction, manufacture, repair or landscaping; or

4. Which presents an unreasonable risk of injury to a person or property.


Whether, and to what to extent, coverage applies in liability policies for claims alleging construction defects is a matter of serious debate both in insurance circles and in the courts. We wrote few weeks ago about some earthshaking decisions reached by the majority of the jurisdictions during 2013 and 2014, finding construction defect coverage under a contractors’ CGL policy. These policies, however, are subject to numerous exclusions and Anti-Indemnification Statutes, Right to Repair/Cure and Statutes of Limitations and Repose. In fact, the defendants in many of these cases have been successful in defeating claims using the defenses of the statutes of limitations and repose.

Among the more frequently addressed exclusions are the so-called “business risk” exclusions, which include the “damage to property”; “damage to your property”, and “damage to your work” exclusions. Other potentially applicable exclusions concern prior work; contractual liability; EIFS; mold; owned property; earth movement, and known or continuing injury or damage. Claims for damages resulting from defective drywall began to appear in about 2005, and courts have frequently addressed whether the standard pollution exclusion, in addition to the above-mentioned exclusions, bars coverage for such claims.


Basic Categories of Construction Defects

There are several categories of construction defects depending on the area of the building or foundation that was affected by defective construction.

· Site Defects

· Building Envelope Defects

· Structural Defects

· Heating, Ventilating, and Air Conditioning Defects

· Electrical and Plumbing Defects

· Fire/Life Safety System Defects


Types of Construction Defects

There are two types of construction defects, latent and patent defects. Latent defects are those defects that are concealed and are often not obvious or readily observable upon reasonable inspection. Even with the most comprehensive on-site inspections, sometimes defective construction may go unnoticed. After construction is complete, Latent Defects are unknown and generally undiscoverable and will only appear after the passage of time.


Examples of Latent Defects are: 

Soils that were not properly compacted.
Improperly installed flashing and/or the total lack of flashing within the building envelope assembly.
Lack of reinforcing in structural concrete footings, walls and/or slabs.
Lack of brick ties and/or masonry reinforcement in a brick/masonry veneer wall.
An improperly installed weatherproofing system.
Improperly installed stucco or EIFS exterior wall system.
Improperly consolidated concrete.
Reinforcement not fully embedded in the concrete structure.


Patent Defects are those defects that are known or would be readily obvious upon reasonable inspection. Examples of Patent Defects are:

· Weep holes not installed in brick veneer walls.
· Handrails omitted in stairways.
· Missing control and/or expansion joints.
· Cracking and/or signs of distress in the building envelope.
· Lack of roof drainage and/or roof slope.
· Lack of proper roof/attic ventilation.


An important distinction to understand in the analysis of con­struction defects is the difference between the “defect” itself and the “manifestation” of the defect, although in general terms, both the defect and the manifestation of the defect must ultimately be corrected. At times these concepts are erroneously considered to be the same and are discussed as if they were synonymous.

In fact, the manifestation of a particular defect is the apparent visible condition of the building, structure or component that gives the observer notice of the possible existence of, and most likely results from, a defect in construction. For example, a crack in a brick veneer wall may be considered to be a defect, but, in fact, it is only the manifestation of a defect. The actual defect may be the result of the failure of one or more components of the brick veneer wall system such as improperly installed or missing flashing; improperly installed or missing expansion joints; improperly installed and/or missing reinforcement; lack of or improperly installed vapor barrier; and/or the improper installation of the brick veneer wall itself.

Examples of the manifestation of a defect include:
· A total or partial collapse of the structure.
· The inability of the structure to prevent water intrusion.
· Cracking, selling or subsidence of concrete flat work.
· Cracking, settling or tilting of walls.
· Doors that are out of plumb and do not fit into the frame.
· Windows that do not operate.
· Foundations that settle crack or subside.

The importance of distinguishing between the manifestation of the defect and the defect itself is critical as the manifesta­tion may provide clues that a Latent Defect exists and further investigation is warranted and necessary. The manifestation of a defect may be the first indication to the owner of a potential problem. Depending on the length of a warranty and in light of the time limitations imposed by a State’s statutes of repose, quick action, notification and possible litigation may be necessary to protect the owner’s rights.






CAUSES OF FAILURES OF BUILDING ENVELOPES

One can think of a building envelope as being similar to envelopes used to mail packages through the postal service. A standard package mailing envelope is used to protect the interior contents from moisture, wind and damage while in transit. The building’s envelope acts like a mailing envelope by protecting the structure from rain, sleet or snow.

A building’s envelope includes the walls, siding, flashing, roof, foundation and so forth. These systems should work together by providing a barrier between the interior of the structure and the exterior environmental elements such as rain and moisture. The installation materials and methods used in the building’s construction will determine how heat, air and moisture travel through the structure.

This year, the construction industry is rapidly approaching the $1 trillion mark. Based on past damage claims, we would expect that there will be about $100 to $200 billion worth of construction defect-related claims. The risks causing these damages include design risks, material risks, construction risks, maintenance risks, and weather-related risks.

Based on extensive analysis of the construction defects over the past 100 years, we can safely say that wall design, wall material, construction and maintenance practices are the most significant factors responsible for the occurrence of the building envelope defects.

Below, we present a number of construction defect photos, illustrating some of the property damage caused by such defects.




DETAILS OF A TYPICAL, PROPERLY CONSTRUCTED, RESIDENTIAL BRICK WALL DRAINAGE SYSTEM














Flashing at the Bottom of Brick-Veneer Walls







Improper through-wall detailing and installation. No weep holes, and the flashing did not extent enough on either direction. Also, the caulking is deficient. As a result, the steel angle lintel corroded and there was a collapse as well.





This is an example of properly shingled through-wall flashing system. As you can see here, the black flashing is on top of the brick ledge. It goes up onto the framing, and is behind the weather-resistive barrier(WRB) (white sheet folded out of the way near top of photo). When the WRB is folded down, it will protect the sheathing from moisture damage due to capillary action.






Failed sealant in need of replacement







Improper design and installation







Damage due to improper installation





This picture clearly displays a problem that we call mortar bridging. This occurs when sloppy workmanship results in mortar getting behind the brick. The problem is that this prevents water from freely draining out of the wall system. In fact, it even bridges the gap between the brick and the framing, allowing water to wick into wood materials, causing lots of problems.




Building codes require that weep holes - holes placed at the base of a masonry wall - be spaced every 16 to 32 inches on center. Here you can see that these weep holes (where the holes are at) are placed directly above the through-wall flashing. If water gets behind this brick, it can freely drain down and be wicked out through these ropes to daylight.





Failed sealant, allowing water to infiltrate the wall





This picture shows what happens when the weep holes get plugged. You can see here that there is water trapped at the base of this brick-veneer wall. It will eventually leak through the building paper and cause moisture problems.






An improper installation of a stainless steel flashing is shown in this image. The edge is held back from the face of the wall. This will allow water that collects on the flashings to run around the edge of the flashings and back into the wall.









An improper installation of flashings and rope wick weeps in a wall system is shown above. Note that the flashings do not meet and obviously cannot be lapped and sealed. The rope wick weep is laid in a mortar joint approximately 3/8 inch above the flashings, meaning that any water collecting on the flashings will not be able to be picked up by the rope wick until it reaches the height of the rope wick on the interior of the wall.




As you can see here there is no air space between the brick and the weather-resistive barrier (WRB), which means there is no pathway for water to freely drain out. Water can easily get trapped behind here, leading to moisture damage. There should be at least a 1-inch airspace between the brick and the WRB.






Failed sealant allowing water to infiltrate





Failed terracotta window surround







EPDM thru-wall flashing membrane is a flexible EPDM rubber membrane that forms a moisture retarder in cavity wall construction by redirecting water to a building exterior















Misaligned rigid board insulation exposes this airspace to water bridging








The mortar bridging and impaction in this two-inch airspace are unacceptable





Flashing for Wood and Fiber-Cement Siding



All cladding systems leak. It's not a matter of if, it's a matter of when. It's important to understand that proper moisture management dictates that when water gets through penetrations, we want this water to drain down the wall freely, and exit the wall at the base of the siding. That's why the detailing and integration of flashings are so critical to building long-lasting, durable buildings.




In this photograph we can see that this home has cement-board siding over foam board sheathing. Even though foam board sheathing is not affected by moisture, codes still require that we have a weather-resistive barrier (WRB). As you can see here, the butt-joint of this siding lines up perfectly with the seam in the foam. So in a wind-driven rain, it would be very easy for water to penetrate this seam, get in between the foam into the wall cavity where it can cause lots of damage. It's critical to have a properly shingled WRB that directs the water downward, where it can exit freely.




This photograph shows an example of improper drainage at the base of the wall in conjunction with cement-board siding. The moisture build-up in the siding shows that the wall is not getting free drainage. One of the problems here is there is not enough space between at the bottom of the siding and that through-wall flashing. There should be at least 1/8 inch gap to prevent capillary action. And it's important that the flashing be properly integrated behind the weather-resistive barrier for proper shingling of water away from the house.




In the photograph on the left, we can see that we have T-111 siding. These T-111 siding panels may not be long enough to side the entire structure without a seam. So here for example, we have two pieces of T-111 siding covered by a trim board. In the photo on the right, we can see there is a substantial amount of damage due to water leaks at the seam where these two pieces of T-111 plywood meet. You can also see that there was a thin piece of metal Z-flashing, but it was not adequately sized, nor properly integrated with the weather-resistive barrier to provide free drainage to the base of the wall.




It's fairly typical for wood or cement-board siding to be installed tightly up against the building wrap, and this can restrict drainage. So manufacturers have created rain-screen materials and drainage wraps. The photo on the left shows a rain-screen product. This is a plastic matrix that is about 1/4-inch thick that facilitates drainage, and provide an air space that helps prevent capillary action, so water can drain down the wall system and exit at the base of the siding. The product on the right is a drainage wrap material. These are different than an standard building wrap in that they have a texture, or in this case, plastic deposited on the surface to create a space for drainage. It doesn't take much or an air space to create better drainage.




Early Deterioration and warping. Note fungus growing on bottom edge.





Edge Checking and swelling. Although each manufacturers product varies slightly the bottom edges should be around 7/16" thick with no swelling present. This area has swelled to over 9/16".



Flashing at the Bottom of Stucco Walls



Stucco is a popular cladding material because it can be durable and long lasting, and it doesn't require a lot of maintenance. However, it is important to follow a few building science principles relating to water management to ensure that the stucco does not trap water or let water into the wall assembly.






A couple things are wrong in this picture: The stucco runs all the way to grade, and there is no weep screed. The bottom of the stucco must have a weep screed to allow water to drain out of the wall system, and this screed should be at least 8 inches above grade. If the stucco runs all the way to grade, moisture from capillary action can wick up into the stucco, and transfer to wood framing.




This picture illustrates how important it is to have a good water management system behind stucco. You can see that rain water has been absorbed into the cracks. Now all stucco cracks; that's fairly common. But that's why it is so important to have a good water management system. Most building codes requires two layers of building wrap, or building paper, and that must be integrated with a weep screed flashing at the base of the wall.







This is a picture of properly integrated flashing at the base of the wall. You can see the stucco screed is perforated - has holes in it - so when the stucco is troweled over the top, it has the capacity to allow moisture to drain through it. What's important to note here is that the back flange on the screed goes up behind the paper, so any water that does get behind the stucco will hit the paper, run down, hit the stucco screed and drain down through the perforations.






In this picture, the stucco screed is reverse shingled at the base of the wall. You can see that the metal flashing is actually in front of the black paper. To be properly shingled, the black paper should overlap the metal stucco screed. That way, when water gets behind the stucco, it runs down the paper onto the metal flashing and is diverted to the exterior.





It's a fairly common building practice to integrate multiple types of cladding on a single wall. For example, here we have stone at the base, with a cap, and then we have stucco at the top. The problem in this photograph is where the stucco interfaces with the capstone: There's no through-wall flashing. Any water that gets behind the stucco, can run down the wall and get trapped by the stone. Note there are no weep holes in the stone, so there's no way for the water to get out. It's always best practice to put through-wall flashing where you have this transition between one cladding system and another.



Water-Managed Adhered Concrete Masonry




Adhered concrete masonry is a term used to describe synthetic stone. Synthetic stone is different than real stone in that it's lighter weight and therefore can be supported by the existing wall system. However, to make it lighter weight, it is much more porous and is considered to be a "reservoir" cladding system (i.e. it holds water). That's why it's important to have a good drainage, particularly at the base of the wall.





The construction sequence is as follows: Typically you have your exterior sheathing, two layers of weather-resistive barrier and perhaps a drainage mat. Then you have you mortar base, your wire lath and your synthetic stone.




These photographs describe the drainage space, or drainage mat, mentioned previously. This is installed over the weather-resistive barrier to create a space that allows any moisture that gets in behind the stone to drain freely down the wall system and out the flashing at the base of the wall.






For adhered concrete masonry veneer to work properly, you have to have adequate drainage at the base of the wall. This means proper integration of your stucco screed, your flashing and your weather-resistive barrier at the base of the wall. You can see that this stucco screed is at the base of the wall and that the weather-resistive barrier is shingled over the top of it.






It's common practice to use other cladding systems with adhered concrete masonry veneer. Here we have a transition point at the base of the siding where it meets the base of the capstone. Below that we have our synthetic stone. It's critical that we have good water management here to divert water away at these siding-to-stone transitions. We want to have through-wall flashing here that diverts water away from the siding to the exterior.





The moisture damage on this home was a direct consequence of improper detailing of the synthetic stone. There are a couple problems: If you look at the photograph on the left, you can see that the synthetic stone runs all the way to grade (in fact, on this home it ran below grade). Also note that at the cap stone at the base of the siding, there was no through-wall flashing to divert water out, before it got into the stone wall. If you look at the photograph on the right, you can see that water got in at the top near the cap stone, ran down the wall, was absorbed by the sheathing and then rotted out the framing and the sheathing at the base of the wall. This is all the direct result of not having adequate flashing at the base of the wall.




Improper design and installation




Improper detailing and installation resulting in trapped water





Water-Managed Vinyl Siding



Because vinyl siding has an air space behind it, it acts like a rain screen. As you can see from this photograph, the water tracks down the foundation wall indicates how freely this siding can drain. In fact, you do not need flashing at the base of the wall with vinyl siding because it has weep holes at every course, allowing for free drainage. You do need to use a weather-resistive barrier. Also, you would need to use flashing at the base of the wall if that siding transitions to a trim board or to another type of cladding.





At first glance, vinyl siding may not appear to be a very water-tight cladding system. But if used with a weather-resistive barrier can be quite effective. The beauty of vinyl siding is that it hangs loosely on the wall, and creates a fairly good air space between the vinyl and the weather-resistive barrier, allowing water to drain freely from the wall system.






Weep holes are at every course of siding. As you can see here, water can freely flow out of the weep holes, rather than being trapped inside the wall system.




Can you spot what's wrong with this picture? The workers are installing vinyl siding but there is no weather-resistive barrier behind it. Building codes now require that there be a weather-resistive barrier behind all exterior claddings.








Common callback: This damage was caused by a leak at the base of wall cladding that did not include proper through-wall
flashing. Typically, these wall leaks are caused by missing flashings, or poorly executed flashing details at the following:

roof-to-wall intersections
penetrations
windows and doors
transitions between different claddings when more than one cladding is used at the bottoms of exterior walls where cladding systems interface with the foundation.





The key to eliminating costly leaks is more than just applying a piece of flashing. You need to create a functional wall assembly
that:

Deflects water away from sheathing, framing and floor-to-foundation intersections.
Drains water as fast and freely as possible to prevent water from being trapped and absorbed by building components.
Dries. Select building materials that allow the wall to dry out when it gets wet, and avoid materials that have the ability to trap moisture.


We are effective negotiators and work hard to resolve cases in a manner that avoids the additional time and expense of a trial. We help both insurers and insureds with water damage claims regarding: 

Stucco: When a builder improperly installs stucco or the building paper behind it, water can seep in and cause damage to the building's framing and sheathing.
Siding: When a builder improperly installs vinyl or steel siding or the housewrap behind it, water can seep in and cause damage to the building's framing and sheathing. Additionally, poor installation may cause the vinyl or steel siding to warp or buckle.

Leaky roofs: Roof leaks are often caused by faulty construction, including poor shingle installation, failure to install kickout flashing and the use of defective shingles.

Foggy, leaky, or improperly installed windows: Improperly installed flashing can allow water to seep around and through the windows and into a property. This can damage the windows, causing them to rot. It can also cause damage to the building's framing and sheathing.

Water leaks can quickly damage and ruin property. And, left uncorrected, water leaks can lead to pervasive mold growth. We assist our clients in addressing these construction defect and property damage claims against their builders to repair these problems. From our offices in several Northeast and Midwest states, we assist clients facing construction defect issues across a ten state coverage area. 



Metropolitan Engineering, Consulting & Forensics (MECF)

Providing Competent, Expert and Objective Investigative Engineering and Consulting Services
P.O. Box 520
Tenafly, NJ 07670-0520
Tel.: (973) 897-8162
Fax: (973) 810-0440
We are happy to announce the launch of our twitter account. Please make sure to follow us at @MetropForensics or @metroforensics

Metropolitan appreciates your business.
Feel free to recommend our services to your friends and colleagues.