MEC&F Expert Engineers

Tuesday, November 18, 2014

PIPELINE AND COMPRESSOR STATION DESIGN AND CONSTRUCTION SERVICES



Pipeline and Compressor Station Design and Construction services





Air Quality Services

METROPOLITAN has provided air quality services for more than 150 pipeline facilities in 20 states in the United States.  Pipeline services include:

•    New Source Review (NSR) permitting
•    Construction and operation (Title V) permitting for pipelines, compressor stations, storage facilities, and other pipeline-related emissions sources
•    Risk management planning
•    Air and Noise Quality Assessment
•    Environmental assessments (FERC and state)
•    Reasonably Available Control Technology (RACT) determinations and demonstrations
•    Best Available Control Technology (BACT) determinations
•    Atmospheric dispersion modeling (including photochemical/ozone)
•    Accidental release modeling
•    Air toxics compliance (NESHAP)
•    Emissions research and characterization
•    Source testing
•    Continuous emission monitoring system (CEMS) installation, certification, and performance testing
•    Meteorological and ambient air quality monitoring
•    General Conformity Rule (GCR) analysis
•    Greenhouse Gas monitoring and reporting





Design, Construction and Environmental Services for the Pipeline Industry

METROPOLITAN also provides comprehensive design, construction oversight, environmental, health, and safety services to support pipeline asset development, operation, and shutdown/closure.  Among these services are permitting and certification of interstate, and local pipelines; toxicity evaluation; Spill Prevention, Control, and Countermeasure plans (SPCC); Storm Water Pollution Prevention Program plans (SWPPP); compliance/ due diligence audits; site investigation and remediation; risk assessment; and construction environmental inspection. 

METROPOLITAN is committed to providing our employees with a safe and healthy work environment. METROPOLITAN is also committed to minimizing the liability concerns that our clients have regarding the safety performance of their contractors. To achieve these goals, METROPOLITAN has developed and currently implements a comprehensive global Health & Safety Program that is designed to protect employees, comply with all applicable governmental regulations, and satisfy our clients’ health and safety requirements.



Compressor Station, NY. For this new compressor station, METROPOLITAN completed the state facility air permit application, dispersion modeling of compressor turbines and engines, air emissions calculations, New Source Review (NSR) and Nonattainment NSR applicability analyses, and agency meetings and negotiations.  METROPOLITAN prepared Resource Report 9 to support FERC filings and Conformity Analysis for construction emissions (off-road and on-road vehicles and fugitive dust).

Air Permitting, West Pipeline, Wyoming, Colorado, Nebraska, and Missouri. METROPOLITAN obtained air permits for four pipeline compressor stations (powered by a combination of IC engines and combustion turbines) in four states.  METROPOLITAN performed emissions calculations, dispersion modeling, NSPS reviews, MACT assessments, state BACT reviews, and agency consultation.  METROPOLITAN also prepared the FERC air quality resource report for the pipeline system.

METROPOLITAN is providing overall Project Management for this very complicated project.  The Project consists of the installation of approximately 21 miles of a 30 to 42-inch natural gas pipeline and associated facilities from Linden, New Jersey to Manhattan, NY.  This Project is located in a highly populated urban location and included a total of nine Horizontal Directional Drills.  METROPOLITAN’s Project Director is responsible for overseeing all aspects of the Project for Spectra Energy including completion of environmental, cultural and civil surveys, routing, right-of-way acquisition, design and material procurement, public and government relations, map preparation, agency coordination and permit application preparation. 

In addition, METROPOLITAN’s responsibilities included managing the construction bid solicitation, contract negotiations and award.  METROPOLITAN is also providing construction management, construction inspection and right-of-way services on the project.Dispersion Modeling, El Paso Natural Gas, Colorado. Using the SCREEN3 model, METROPOLITAN performed dispersion modeling for a proposed compressor station.



Designed a 26-mile, 24-inch diameter natural gas pipeline in North central Pennsylvania for a confidential client.  The pipeline moves 300 million standard cubic feet per day (mmscfd) of dry gas from the client’s metering and regulation site to a new compressor station at the Transco Hub. The project crossed three state forests managed by the Pennsylvania Department Conservation and Natural Resources (DCNR).  The design included four compressor stations each with a capacity of 75 mmscfd. The compressor station design included inlet scrubbers, discharge coalescing filters, fuel gas system, and compressor buildings to house the units and minimize noise.  An ultrasonic meter system provides custody transfer between the client and Transco.  In addition to the mainline design, REI is designing a 16-mile, 20-inch diameter transfer pipeline to move 200 mmscfd from the Wellsboro Loop System near Wellsboro, PA, to the client’s meter and regulation station located on the Dominion Pipeline. This line also crosses Pennsylvania State Forest land.

Provided construction and environmental inspection for approximately 190-miles of 42-inch and 36-inch diameter natural gas pipeline; the receiving supply is from Elba Island, runs northwest, and interconnects with pipelines and customers along the route.

Marcellus Shale Pipeline Projects: Worked in a construction inspection team for 12-miles of 8 to 16-inch fiberglass and steel pipe used to transport raw water from the Susquehanna River to transfer points.



Worked on a project in NY of approximately 17-miles of pipeline, eight storage wells, and compression modification.   Performed construction inspections.  Performed wetland delineations, habitat assessments, agency consultation, permit application preparation, FERC environmental resource reports, and cultural resource surveys for this natural gas storage project.  Coordinated public and agency meetings.  Provided environmental inspection and support for all agency coordination and permit issues.  

Performed technical review of proposed construction contract and provided comments where document did not meet current industry practices.  Also provided recommended changes to the terms and conditions section of the contract to protect the client’s liabilities.Compressor Station Hazards Assessment, Pipeline Company, Utah. To respond to a regulatory agency request due to the station’s location in a wildland area that has a higher probability of wildfires, METROPOLITAN assessed the hazards posed by releases from the station’s emergency shutdown vent stack.

Based on NFPA guidelines, METROPOLITAN assessed the hazards of high-pressure vented releases in the presence of flames, ash, and sparks, in consideration to site-specific conditions such as topography and vegetation density.

METROPOLITAN provided a compliance support program for a Pipeline Project that consists of the construction of approximately 110 miles of natural gas transmission pipeline in new and existing rights of way in West Virginia (northern and central) and Pennsylvania, the construction of five natural gas compressor stations in West Virginia, and two metering and regulation (M&R) facilities in Pennsylvania.  METROPOLITAN was responsible for staffing and implementing the environmental compliance program for the Project under the direction of Pipeline owner’s environmental group.  The FERC required full-time monitoring of the Project.  The environmental compliance program monitored construction, supported regulatory inspections (federal, state and local representatives), collected data to comply with environmental permits, landowner complaints and internal reporting, and oversaw project construction variance requests.   METROPOLITAN continued to provide inspection support during post-construction restoration repairs.




METROPOLITAN is providing overall Project Management for a Pipeline Project that consists of the installation of approximately 21 miles of a 30 to 42-inch natural gas pipeline and associated facilities from Linden, New Jersey to Manhattan, NY.  This Project is located in a highly populated urban location and included a total of nine Horizontal Directional Drills.  METROPOLITAN is responsible for completion of environmental, cultural and civil surveys, routing, right-of-way acquisition, design and material procurement, public and government relations, map preparation, agency coordination and permit application preparation.  In addition, METROPOLITAN’s responsibilities included managing the construction bid solicitation, contract negotiations and award.  METROPOLITAN is also providing construction management, construction inspection and right-of-way services on the project.
Performed construction inspections for a large number of pipeline construction projects, metering & regulation facilities, and compressor stations.


Compressor Station Emissions Measurement
For oil and gas pipeline transmission companies, METROPOLITAN has performed emissions testing of turbine and reciprocating engine powered compressor stations across the Northeast and Midwest USA.  Services we provide include compliance tests (federal and state), NOX RACT demonstrations, NOX PEMS (Predictive Emissions Monitoring System) certifications, and emission inventories. We also provide observers to confirm measurements performed by other firms are done correctly.




Metropolitan Engineering, Consulting & Forensics (MECF)
Providing Competent, Expert and Objective Investigative Engineering and Consulting Services
P.O. Box 520
Tenafly, NJ 07670-0520
Tel.: (973) 897-8162
Fax: (973) 810-0440
We are happy to announce the launch of our twitter account. Please make sure to follow us at @MetropForensics or @metroforensics

Metropolitan appreciates your business.
Feel free to recommend our services to your friends and colleagues.

To unsubscribe from future technical blogs and announcements, please reply to this email with the word “unsubscribe” in the subject line.


NATURAL GAS DEHYDRATION AT HYDRAULIC FRACTURING SITES USING TRIETHYLENE GLYCOL (TEG)


NATURAL GAS DEHYDRATION AT HYDRAULIC FRACTURING SITES USING TRIETHYLENE GLYCOL (TEG)




With all the compressor stations being built in the United States to help transport the natural gas to the point of destination, we often here the term glycol dehydration unit.  Natural gas contains a certain amount of water.  That water must be removed, along with other constituents, prior to be allowed to enter the pipeline.  This is to prevent pipeline corrosion and mechanical damage to downstream equipment.



Triethylene glycol (TEG) is the predominant liquid desiccant employed to remove water vapor from natural gas streams.
Most natural gas producers use Triethylene glycol (TEG) to remove water from the natural gas stream in order to meet the pipeline quality standards.  This process is required to prevent hydrates formation at low temperatures or corrosion problems due to the presence of carbon dioxide or hydrogen sulfide (regularly found in natural gas).




Dehydration, or water vapor removal, is accomplished by reducing the inlet water dew point (temperature at which vapor begins to condense into a liquid) to the outlet dew point temperature which will contain a specified amount of water. 

Absorption of water vapor in the TEG is the common method.  The wet gas is brought into contact with dry glycol in an absorber in a packed or tray section.  Water vapor is absorbed in the glycol and consequently, its dew point reduces.  The wet rich glycol then flows from the lower section of the absorber to a regeneration system in which the entrained gas is separated and fractionated in a column and reboiler.  The dry gas exits at the top of the absorber.  The heating allows boiling off the absorbed water vapor and the water dry lean glycol is cooled (via heat exchange) and pumped back to the absorber. 




Rich glycol passes through a reflux coil in the reboiler still, preheats in a glycol/glycol exchanger and then enters the flash tank. In the flash tank, hydrocarbons and dissolved gas are separated from the rich glycol. The rich glycol exits the flash tank and passes through a charcoal filter, sock filter, and is subsequently preheated in another glycol/glycol exchanger prior to entering the reboiler through the reboiler still column. The rich glycol is heated to approximately 400°F as water is boiled off and exits through the vent atop the reboiler still.





Lean glycol is cooled prior to being pumped through a glycol/gas heat exchanger and into the absorber to continue the process. Water removal depends on several factors such as: gas pressure and temperature, gas composition, glycol circulation rate, glycol purity and efficiency of glycol to gas contact.




CONDENSATE STABILIZATION
Many natural gas fields, such as the hydraulic fracturing fields of North Dakota, also produce a light hydrocarbon liquid product (condensate) along with the gas.  For this liquid to be shipped safely in atmospheric pressure trucks and to avoid high vaporization losses, the liquid is stabilized using heat and a fraction tower to set the liquid vapor pressure within acceptable limits. The light products removed from the heavier liquid can be used as fuel and/or many other uses. The stabilized liquid is cooled before going to storage tanks.






Metropolitan Engineering, Consulting & Forensics (MECF)



Providing Competent, Expert and Objective Investigative Engineering and Consulting Services



P.O. Box 520



Tenafly, NJ 07670-0520



Tel.: (973) 897-8162



Fax: (973) 810-0440















We are happy to announce the launch of our twitter account. Please make sure to follow us at @MetropForensics or @metroforensics




Metropolitan appreciates your business.



Feel free to recommend our services to your friends and colleagues.