MEC&F Expert Engineers

This blog presents Metropolitan Engineering Consulting & Forensics (MEC&F) claim management and claim investigation analyses of some of the typical claims we handle

Thursday, December 4, 2014

GAS COMPRESSOR FACILITIES FOR THE CONSTITUTION PIPELINE - THE WRIGHT COMPRESSOR STATION EXPANSION

›
    GAS COMPRESSOR FACILITIES FOR THE CONSTITUTION PIPELINE As part of the original proposal, Constitution Pipeline Company ...

HIGH POTENTIAL NEAR MISS – UPDATE - ORDER RESPECTING DANGEROUS OPERATION ON HMDC GBS SLAB

›
High Potential Near Miss – Update   - Order Respecting Dangerous Operation on HMDC GBS Slab October 14, 2014 On Friday,...

HIGH POTENTIAL NEAR MISS – SAFETY RETENTION CLAMP DROPPED 40 FEET ON THE GSF GRAND BANKS DRILLING RIG

›
High Potential Near Miss – Safety Retention Clamp Dropped 40 feet on the GSF Grand Banks drilling rig O...

C-NLOPB following up on Synthetic Based Drilling Fluid Spill

›
C-NLOPB following up on Synthetic Based Drilling Fluid Spill   November 19, 2014 The C-NLOPB is following up on a report by Statoil...

HIGH POTENTIAL NEAR MISS ON THE WEST AQUARIUS DRILLING RIG. EXXONMOBIL AND CHEVRON CANADA ARE THE PRINCIPAL CURRENT OIL RIG OPERATORS.

›
High Potential Near Miss on THE West Aquarius drilling rig.   ExxonMobil AND CHEVRON CANADA ARE the PRINCIPAL current oil rig o...
‹
›
Home
View web version
Powered by Blogger.